Is there a way to add comments in ProcessAnalyst linked to a timestamp?

Hello everybody,

I have a trend in process analyst looking like this:

Every occurrence that the line stops, indicated in GREEN->RED status bar at the bottom of the trend, the operator should enter a reason why he stopped like BREAK or Product change.
This reason should be linked to the specific timestamp of the occurrence.

Is there a way to achieve this:

If not, is there another creative way to accomplish this?

Regards,

Jan Lonij

Parents Reply Children
No Data